IRB Tutorial 4: Exempt & Expedited Applications

This tutorial explains how an IRB application can be exempt from review or received an expedited review - both of these greatly speeds up the IRB turn-around time.

Shockwave Flash file icon IRB Lecture 4 Exempt & Expedited.swf — Shockwave Flash file, 14.45 MB (15150374 bytes)

Document Actions